1. Introducing our state-of-the-art hydraulic self-propelled train—designed to eliminate the need for a retractable column winch, thus overcoming traditional track equipment train drawbacks. This innovation ensures operations are safer, more convenient, and highly efficient. 2. Say goodbye to the laborious and frequent rail laying and hauling operations. This enhancement reduces worker labor intensity, boosts safety, and eliminates the need for roadway hardening, thereby slashing material costs. 3. Equipped with a triangular coal cleaner and a robust Russian roof device at the front, our train effortlessly adapts to gradients up to 15°, significantly enhancing its climbing ability. 4. The divided frame design features a self-moving slide way on both sides of the slipper, with a rigid and reliable connection between trains. The connecting device is anti-slipping, ensuring stability and reliability. 5. The train boasts a side-pushing oil cylinder to adjust deviation, preventing derailment and ensuring smooth operation. 6. Roof cables and pipe brackets are meticulously integrated, promoting standardized management of the fully-mechanized mining face. 7. Our leveling train function ensures the pump maintains sufficient suction on inclines, guaranteeing uninterrupted operation. 8. Equipped with local control, the train offers intuitive and straightforward operation. 9. The retractable cable bracket saves time and effort by minimizing frequent cable deliveries, reducing labor intensity, and enhancing overall work efficiency.






